Ministère de l'Environnement
et de la Lutte contre les changements climatiques
Search Quebec.ca
Navigation par thématique
Menu de la section changements climatiques

The Carbon Market

Register of Offset Credit Projects

The Register of Offset Credit Projects is a public database that contains information and various documents concerning projects submitted to the Minister under the offset credit component of the Québec cap-and-trade system for GHG emission allowances (SPEDE). Its contents include all project reports and verification reports submitted pertaining to the application for the issuance of offset credits and the breakdown of the credits issued for each project. The register is updated each second and fourth non-holiday Wednesday of the month.

The register indicates the number of offset credits issued corresponding to the GHG emission reductions or removal of GHGs from the atmosphere as a result of the project. Out of the total number issued, 97% of the credits, rounded down to the nearest whole number, are transferred to the promoter and the remainder are placed in the Minister’s environmental integrity account.

Register

Project Code Promoter Name Project title Number of offsets credits issued
Regulation respecting landfill methane reclamation and destruction projects eligible for the issuance of offset credits (replacing protocol 2 on the CH4 treatment or destruction of landfill sites)
LE001 WSP Canada Inc. Reduction of GHG emissions at Marchand sanitary landfill site 70,695
LE002 WSP Canada Inc. Reduction of GHG emissions at the sanitary landfill site and the engineered landfill site of La Lièvre 45,017
LE003 Terreau Biogaz s.e.c. Capture and destruction of biogas – Area B of RDL engineered landfill site 99,187
LE004 WSP Canada Inc. Reduction of GHG emissions at the Saint-Raymond sanitary landfill site 18,873
LE005 Régie intermunicipale des déchets de La Rouge Reduction of GHG emissions at the Marchand engineered landfill site 56,989
LE006 WSP Canada Inc. Reduction of GHG emissions at the Saint-Flavien engineered landfill site 34,801
LE007 WSP Canada Inc. Reduction of GHG emissions at the Gaspé engineered landfill site 28,254
LE008 Terreau Biogaz s.e.c. Capture and destruction of biogas – Nouvelle-Beauce engineered landfill site 53,844
LE009 WSP Canada Inc. Reduction of GHG emissions at the Val d’Or engineered landfill site 36,304
LE010 Terreau Biogaz s.e.c Capture and destruction of biogas from the Neuville closed landfill  
LE011 Terreau Biogaz s.e.c Capture and destruction of biogas from the Robertsonville sanitary landfill site 10,596
LE012 Terreau Biogaz s.e.c Capture and destruction of biogas from the Ragueneau engineered landfill site 19,055
Regulation respecting halocarbon destruction projects (replacing protocol 3 on the destruction of ozone depleting substances)
SACO001 Recyclage Écosolutions Inc. ODS extraction and destruction 161,510
SACO002 Recyclage Écosolutions Inc. Extraction and destruction of ODS contained in isolating foam or used as refrigerants 322,943
SACO003 Groupe PureSphera Inc. Extraction and destruction of ODS contained in isolating foam or used as refrigerants 50,165
SACO004 Groupe PureSphera Inc. ODS extraction and destruction 44,167
Total 1,052,400

Updated: July 22nd, 2021

Information for project LE001

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest, Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Project title Reduction of GHG emissions at the Marchand sanitary landfill site
Summary description of the project The construction and operation of a landfill gas collection and destruction system at the Marchand sanitary landfill site (lieu d’enfouissement sanitaire – LES) was performed under the "Programme Biogaz" of the Ministère. This project allowed for the reduction of GHG emissions totalling 70,587 tonnes from August 27, 2009 to December 31, 2013. Since the “Programme Biogaz” is now over, WSP wishes to continue the voluntary reduction of GHG emissions at the Marchand sanitary landfill site under the SPEDE program.
Project site location 688, chemin du Parc Industriel, Rivière-Rouge (Québec) J0T 1T0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2014-12-22
Average annual reductions estimated by the promoter (mt CO2 eq.) 7,600
Total reductions estimated by the promoter (mt CO2 eq.) 76,138
Project commencement date 2014-01-01 (real)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period
Report period date 2014-01-01 to 2014-12-31
Number of offset credits issued 11,205
Issuance date 2015-10-28
Note concerning the issuance of offset credits (PDF, 70 KB)
Project report (French, PDF, 4 MB)
Verification report (French, PDF, 834 KB)
2nd reporting period
Report period date 2015-01-01 to 2015-12-31
Number of offset credits issued 11,485
Issuance date 2016-06-08
Note concerning the issuance of offset credits (PDF, 121 KB)
Project report (French, PDF, 8 MB)
Verification report (French, PDF, 466 KB)
3rd reporting period
Report period date 2016-01-01 to 2016-12-31
Number of offset credits issued 10,868
Issuance date 2017-07-26
Note concerning the issuance of offset credits (PDF, 120 KB)
Project report (French, PDF, 6.4 MB)
Verification report (French, PDF, 378 KB)
4th reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 10,487
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 19 KB)
Project report (French, PDF, 5.8 MB)
Verification report (French, PDF, 1.2 MB)
5th reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 9,220
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 89 KB)
Project report (French, PDF, 9.1 MB)
Verification report (French, PDF, 671 KB)
6th reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 7,314
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 6.9 MB)
Verification report (French, PDF, 708 KB)
7th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 10,116
Issuance date 2021-04-28
Note concerning the issuance of offset credits (PDF, 114 KB)


Information for project LE002

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest, Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Original project title Reduction of GHG emissions at the La Lièvre sanitary landfill site
Summary description of the project The construction and operation of a landfill gas collection and destruction system at the La Lièvre sanitary landfill site (lieu d'enfouissement sanitaire –LES) was performed under the "Programme Biogaz" of the Ministère. This project allowed for the reduction of GHG emissions totalling 37,122 tonnes from August 19, 2009 to December 31, 2013. Since the “Programme Biogaz” is now over, WSP wishes to continue the voluntary reduction of GHG emissions at the La Lièvre sanitary landfill site under the SPEDE program.
Project site location 1064, rue Industrielle, Mont-Laurier (Québec) J9L 3V6
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) November 2014
Average annual reductions estimated by the promoter (mt CO2 eq.) 4,500
Total reductions estimated by the promoter (mt CO2 eq.) 45,220
Project commencement date 2014-01-01 (real)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period
Report period date 2014-01-01 to 2014-12-31
Number of offset credits issued 4,946 
Issuance date 2015-12-09
Note concerning the issuance of offset credits (PDF, 69 KB)
Project report  (French, PDF, 10 MB)
Verification report (French, PDF, 817 KB)
Modification of the project
Modified project title Reduction of GHG emissions at the sanitary landfill site and the engineered landfill site of La Lièvre
Description of the modifications The project modification is mainly to connect the engineered landfill site (lieu d'enfouissement technique – LET) to the existing biogas capture and destruction system at the sanitary landfill site (lieu d’enfouissement sanitaire – LES) of La Lièvre. The initial project involved only the sanitary landfill, containing 314,015 tonnes of waste and including a total of 26 extraction wells. The modified project extends the biogas collection system to the engineered landfill, containing 114,138 tonnes on November 30, 2015, via three new extraction wells. The connection of the engineered landfill to the sanitary landfill system was completed on November 26, 2015.
Summary description of the modified project The construction and operation of a landfill gas collection and destruction system at the La Lièvre sanitary landfill was performed under the "Programme Biogaz" of the Ministère. This project allowed for the reduction of GHG emissions totalling 37,122 tonnes from August 19, 2009 to December 31, 2013. Since the “Programme Biogaz” is now over, WSP wishes to continue the voluntary reduction of GHG emissions at the La Lièvre sanitary and engineered landfills under the SPEDE program.
Modified project commissioning date 2015-11-26
Average annual reductions estimated by the promoter for sanitary and engineered landfills (mt CO2 eq.) (sanitary landfill) 4,500
(engineered landfill) 4,400
Total reductions estimated by the promoter for sanitary and engineered landfills (mt CO2 eq.) (sanitary landfill) 45,220
(engineered landfill) 40,200
2nd reporting period
Report period date 2015-01-01 to 2015-12-31
Number of offset credits issued 4,248
Issuance date 2016-07-13
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report  (French, PDF, 3.8 MB)
Verification report (French, PDF, 585 KB)
3rd reporting period
Report period date 2016-01-01 to 2016-12-31
Number of offset credits issued 6,178
Issuance date 2017-08-09
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report  (French, PDF, 8 MB)
Verification report (French, PDF, 385 KB)
4th reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 8,268
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 19 KB)
Project report  (French, PDF, 19 MB)
Verification report (French, PDF, 1.2 MB)
5th reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 7,051
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 91 KB)
Project report  (French, PDF, 28 MB)
Verification report (French, PDF, 644 KB)
6th reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 7,541
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report  (French, PDF, 40 MB)
Verification report (French, PDF, 701 KB)
7th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 6,785
Issuance date 2021-04-28
Note concerning the issuance of offset credits (PDF, 110 KB)


Information for project LE003

Information on the promoter

Promoter’s contact information Terreau Biogaz s.e.c.
  1327, avenue Maguire, suite 100, Québec (Québec) G1T 1Z2, Canada
  418 476-1686
  rino.dumont@groupeth.com
Contact information for the promoter’s representative Stephen Davidson
  1205 rue Ampère, bureau 310, Boucherville (Québec) J4B 7M6, Canada
  514 293-4883
  stephen.davidson@tetratech.com
   
Information on the project  
Project title Capture and destruction of biogas – Area B of the RDL engineered landfill site
Summary description of the project In agreement with the city of Rivière-du-Loup (RDL), a biogas extraction and destruction system was built at the engineered landfill site (lieu d’enfouissement technique – LET) of the city. The biogas is collected from the vertical and horizontal wells of area B in a network of underground pipes and routed to a continuously operating flare for destruction. The site has two separate landfill areas. The present application relates to only one area, the one in operation, i.e. area B.
Project site location Lots 36 to 40, rang 1, municipalité de Cacouna (Québec)
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2015-06-15
Average annual reductions estimated by the promoter (mt CO2 eq.) 30,000
Total reductions estimated by the promoter (mt CO2 eq.) 300,000
Project commencement date 2015-02-01 (estimated)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period
Report period date 2015-03-04 to 2015-12-31
Number of offset credits issued 5,132
Issuance date 2017-05-10
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 47 KB)
Verification report (French, PDF, 77 KB)
2nd reporting period
Report period date 2016-01-01 to 2016-12-31
Number of offset credits issued 
9,535
Issuance date 2017-09-27
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 52.3 MB)
Verification report (French, PDF, 121 KB)
3rd reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 
10,913
Issuance date 2018-07-25
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French , PDF, 524.1 MB)
Verification report (French, PDF, 820 KB)
4th reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 
17,133
Issuance date 2019-06-26
Note concerning the issuance of offset credits (PDF, 93 KB)
Project report (French , PDF, 43.7 MB)
Verification report (French, PDF, 43.3 MB)
5th reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 
24,571
Issuance date 2020-05-13
Note concerning the issuance of offset credits (PDF, 116 KB)
Project report (French , PDF, 45.1 MB)
Verification report (French, PDF, 45.2 MB)
Issuance of offset credits - 6th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 
31,903
Issuance date 2021-06-09
Note concerning the issuance of offset credits (PDF, 116 KB)
Project report (French , PDF, 41.6 MB)
Verification report (French, PDF, 41.22 MB)


Information for project LE004

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest, Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Project title Reduction of GHG emissions at the Saint-Raymond sanitary landfill site
Summary description of the project The construction and operation of a landfill gas collection and destruction system at the Saint-Raymond sanitary landfill site (lieu d'enfouissement sanitaire – LES) was performed under the "Programme Biogaz" of the Ministère. This project allowed for the reduction of GHG emissions totalling 38,339 tonnes from August 12, 2009 to December 31, 2013. Since the “Programme Biogaz” is now over, WSP wishes to continue the voluntary reduction of GHG emissions at the Saint-Raymond sanitary landfill under the SPEDE program.
Project site location 590, chemin de Bourg-Louis, Saint-Raymond (Québec) G3L 4G2
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2015-03-05
Average annual reductions estimated by the promoter (mt CO2 eq.) 4,071
Total reductions estimated by the promoter (mt CO2 eq.) 40,711
Project commencement date 2015-01-01 (real)
Project duration (years) 10 (estimated)
Other information Project ended
Issuance of offset credits
1st reporting period
Report period date 2015-01-01 to 2015-12-31
Number of offset credits issued 4,746
Issuance date 2016-07-13
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report  (French, PDF, 3 MB)
Verification report (French, PDF, 467 KB)
2nd reporting period
Report period date 2016-01-01 to 2016-12-31
Number of offset credits issued 3,746
Issuance date 2017-08-09
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 3 MB)
Verification report (French, PDF, 305 KB)
3rd reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 2,876
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 5 MB)
Verification report (French, PDF, 860 KB)
4th reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 2,991
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 88 KB)
Project report (French, PDF, 7.3 MB)
Verification report (French, PDF, 612 KB)
5th reporting period
Report period date 2019-01-01 to 2019-12-31 
Number of offset credits issued 2,395
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 7.2 MB)
Verification report (French, PDF, 639 KB)
6th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 2,119
Issuance date 2021-04-28
Note concerning the issuance of offset credits (PDF, 110 KB)



Information for project LE005

Information on the promoter

Promoter’s contact information Régie intermunicipale des déchets de La Rouge
  688, ch. du Parc Industriel, Rivière-Rouge (Québec) J0T 1T0
  819 275-3205
  ridr1@bellnet.ca
Contact information for the promoter’s representative Marc Forget
  688, ch. du Parc Industriel, Rivière-Rouge (Québec) J0T 1T0
  819 275-3205
  ridr@bellnet.ca
   
Information on the project  
Project title Reduction of GHG emissions at the Marchand engineered landfill site
Summary description of the project The Marchand engineered landfill site (lieu d'enfouissement technique – LET) has been in operation since 2006. According to the requirements of the Certificate of Approval, the landfill gas is passively vented into the atmosphere. The main objective of the project is to actively collect the landfill gas produced and burn it in an enclosed flare in order to voluntarily reduce the release of GHG emissions into the atmosphere. The biogas of the engineered landfill site is destroyed by the flare of the Marchand sanitary landfill site (the destruction of the biogas of the sanitary landfill makes up another offset credit project, i.e. LE001), but the measurement instruments of both landfill sites enable the attribution of the emission reductions to each project.
Project site location 688, chemin du Parc Industriel, Rivière-Rouge (Québec) J0T 1T0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2015-10-30
Average annual reductions estimated by the promoter (mt CO2 eq.) 10,070
Total reductions estimated by the promoter (mt CO2 eq.) 100,700
Project commencement date 2015-01-01 (estimated)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period

Report period date

2014-12-11 to 2015-12-10

Number of offset credits issued 1,170
Issuance date 2016-06-22
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 5 MB)
Verification report (French, PDF, 415 KB)
2nd reporting period
Report period date 2015-12-11 to 2016-12-31
Number of offset credits issued 2,165
Issuance date 2017-07-12
Note concerning the issuance of offset credits (PDF, 17 KB)
Project report (French, PDF, 14.5 MB)
Verification report (French, PDF, 409 KB)
3rd reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 2,555
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 17 KB)
Project report (French, PDF, 12.5 MB)
Verification report (French, PDF, 1.2 MB)
4th reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 9,784
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 88 KB)
Project report (French, PDF, 23.8 MB)
Verification report (French, PDF, 818 KB)
Modification of the project
Description of the modification   The project modification consisted of putting in place a GHG destruction system, a flare, dedicated to the engineered landfill site biogas.
Modification commissioning date 2018-10-18
5th reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 19,246
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 111 KB)
Project report (French, PDF, 28 MB)
Verification report (French, PDF, 886 KB)
6th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 22,069
Issuance date 2021-04-28
Note concerning the issuance of offset credits (PDF, 109 KB)
Project report (French, PDF, 26.6 MB)
Verification report (French, PDF, 27.3 MB)


Information for project LE006

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest, Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Project title Reduction of GHG emissions at the Saint-Flavien engineered landfill site
Summary description of the project A landfill gas extraction and destruction system was established and commissioned at the Saint-Flavien engineered landfill site (lieu d'enfouissement technique – LET) in the region of Lotbinière in 2016. The greenhouse gas (GHG) emission reductions thus obtained will be recorded within Protocol 2 of the Québec cap-and-trade system for greenhouse gas emission allowances. This protocol provides a framework for the creation of offsets via methane thermal oxidation in a flare on a voluntary basis. According to initial estimates, the project will result in a reduction in emissions estimated at around 100,000 tons carbon equivalent over 10 years.
Project site location 1450, rang de la Pointe-du-Jour, Saint-Flavien (Québec) G0S 2M0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2016-02-02
Average annual reductions estimated by the promoter (mt CO2 eq.) 10 787
Total reductions estimated by the promoter (mt CO2 eq.) 107 871
Project commencement date 2016-01-01 (estimated)
Project duration (years) 10 (real)
Issuance of offset credits
1st reporting period
Report period date 2016-01-01 to 2016-12-31
Number of offset credits issued 4,116
Issuance date 2017-09-13
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 10 MB)
Verification report (French, PDF, 407 KB)
2nd reporting period
Report period date 2017-01-01 à 2017-12-31
Number of offset credits issued 7,689
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 13 MB)
Verification report (French, PDF, 1 MB)
3rd reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 7,548
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 89 KB)
Project report (French, PDF, 20.6 MB)
Verification report (French, PDF, 610 KB)
4th reporting period
Report period date 2019-01-01 to 2019-12-31 
Number of offset credits issued 8,042
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 26 MB)
Verification report (French, PDF, 631 KB)
 5th reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 7,406
Issuance date 2021-06-09
Note concerning the issuance of offset credits (PDF, 111 KB)
Project report (French, PDF, 25.6 MB)
Verification report (French, PDF, 631 KB)



Information for project LE007

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest, Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Project title Reduction of GHG emissions at the Gaspé engineered landfill site
Summary description of the project A landfill gas extraction and destruction system was established and commissioned at the Gaspé engineered landfill site (lieu d'enfouissement technique – LET) in late 2016 – early 2017. The greenhouse gas (GHG) emission reductions thus obtained will be recorded within Protocol 2 of the Québec cap-and-trade system for greenhouse gas emission allowances. This protocol provides a framework for the creation of offsets via methane thermal oxidation in a flare on a voluntary basis. According to initial estimates, the project will result in a reduction in emissions estimated at around 110,000 tons carbon equivalent over 10 years.
Project site location 1050, montée Wakeham, Gaspé (Québec) G4X 2A2
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2016-08-23
Average annual reductions estimated by the promoter (mt CO2 eq.) 11,000
Total reductions estimated by the promoter (mt CO2 eq.) 110,000
Project commencement date 2016-01-12 (estimated)
Project duration (years) 10 (real)
Issuance of offset credits
1st reporting period
Report period date 2017-05-27 to 2017-12-31
Number of offset credits issued 4,886
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 17 MB)
Verification report (French, PDF, 1.7 MB)
2nd reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 8,791
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 91 KB)
Project report (French, PDF, 44 MB)
Verification report (French, PDF, 595 KB)
3rd reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 7,455
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 46 MB)
Verification report (French, PDF, 632 KB)
4rd reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 7,122
Issuance date 2021-06-09
Note concerning the issuance of offset credits (PDF, 117 KB)
Project report (French, PDF, 50 MB)
Verification report (French, PDF, 551 KB)



Information for project LE008

Information on the promoter

Promoter’s contact information Terreau Biogaz s.e.c.
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
Contact information for the promoter’s representative Rino Dumont
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
   
Information on the project  
Project title Capture and destruction of biogas – Nouvelle-Beauce engineered landfill site
Summary description of the project A biogas capture and destruction system is in place on a portion of the Nouvelle-Beauce engineered landfill site (ELS) in Frampton. The biogas is collected by vertical wells and routed via a network of collecting pipes to a flare for destruction As landfilling progresses on the site, new (horizontal and vertical) capture wells will be built in the waste mass.
Project site location 10 Route Boulet, Frampton (Québec) G0R 1M0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects 
Date of submission of project notification (or date of registration) November 2018
Average annual reductions estimated by the promoter (mt CO2 eq.) 9,000
Total reductions estimated by the promoter (mt CO2 eq.) 90,000
Project commencement date 2016-11-01 (estimated)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period
Report period date 2017-01-01 to 2017-12-31
Number of offset credits issued 12,234
Issuance date 2018-07-25
Note concerning the issuance of offset credits (PDF, 19 KB)
Project report (French, PDF, 7.2 MB)
Verification report (French, PDF, 810 KB)
2nd reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 13,215
Issuance date 2019-06-26
Note concerning the issuance of offset credits (PDF, 92,8 KB)
Project report (French, PDF, 10.7 MB)
Verification report (French, PDF, 16 MB)
3rd reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 12,924
Issuance date 2020-05-13
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 17.9 MB)
Verification report (French, PDF, 18.2 MB)
4rd reporting period
Report period date 2020-01-01 à 2020-12-31
Number of offset credits issued 15,471
Issuance date 2021-06-09
Note concerning the issuance of offset credits (PDF, 111 KB)
Project report (French, PDF, 14.4 MB)
Verification report (French, PDF, 14.9 MB)



Information for project LE009

Information on the promoter

Promoter’s contact information WSP Canada Inc.
  16-1600, boul. René-Lévesque Ouest,
Montréal (Québec) H3H 1P9, Canada
  514 340-0046
  catherine.verrault@wsp.com
Contact information for the promoter’s representative Marc Bisson
  1135, boul. Lebourgneuf, Québec (Québec) G2K 0M5, Canada
  418 623-2254
  marc.bisson@wsp.com 
   
Information on the project  
Project title Reduction of GHG emissions at the Val d’Or engineered landfill site
Summary description of the project A landfill gas extraction and destruction system was established and commissioned at the Val d'Or engineered landfill site (lieu d'enfouissement technique – LET) in mid-2017. The greenhouse gas (GHG) emission reductions thus obtained will be recorded within Protocol 2 of the Québec cap-and-trade system for greenhouse gas emission allowances. This protocol provides a framework for the creation of offsets via methane thermal oxidation in a flare on a voluntary basis. According to initial estimates, the project will result in a reduction in emissions estimated at around 175,000 tons carbon equivalent over 10 years.
Project site location 2001 3e Avenue Est, Val-d'Or (Québec) J9P 7B4
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2017-02-02
Average annual reductions estimated by the promoter (mt CO2 eq.) 17,500
Total reductions estimated by the promoter (mt CO2 eq.) 175,000
Project commencement date 2017-06 (estimated)
Project duration (years) 10 (real)
Issuance of offset credits
1st reporting period
Report period date 2017-07-20 to 2017-12-31
Number of offset credits issued 4,117
Issuance date 2018-07-11
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 10 MB)
Verification report (French, PDF, 1.7 MB)
2nd reporting period
Report period date 2018-01-01 to 2018-12-31
Number of offset credits issued 9,501
Issuance date 2019-07-24
Note concerning the issuance of offset credits (PDF, 89 KB)
Project report (French, PDF, 47.8 MB)
Verification report (French, PDF, 609 KB)
3rd reporting period
Report period date 2019-01-01 to 2019-12-31
Number of offset credits issued 10,970
Issuance date 2020-06-10
Note concerning the issuance of offset credits (PDF, 112 KB)
Project report (French, PDF, 46 MB)
Verification report (French, PDF, 677 KB)
4rd reporting period
Report period date 2020-01-01 to 2020-12-31
Number of offset credits issued 11,716
Issuance date 2021-06-09
Note concerning the issuance of offset credits/a> (PDF, 112 KB)
Project report (French, PDF, 49.7 MB)
Verification report (French, PDF, 540 KB)



Information for project LE010

Information on the promoter

Promoter’s contact information Terreau Biogaz s.e.c.
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
Contact information for the promoter’s representative Rino Dumont
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
   
Information on the project  
Project title Capture and destruction of biogas from the Neuville closed landfill
Summary description of the project A biogas collection system is expected to be in place on the closed landfill managed by the Régie régionale des gestions des matières résiduelles de Portneuf, located in Neuville. Biogas will be collected by vertical wells and routed via a collector pipeline to an existing invisible flame flare for destruction. The closed landfill network is separate from the landfill in operation.
Project site location 1300, chemin du site, Neuville (Québec) G0A 2R0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration 2020-12-01
Average annual reductions estimated by the promoter (mt CO2 eq.) 7,786
Total reductions estimated by the promoter (mt CO2 eq.) 77,860
Project commencement date 2018-04-15 (estimated)
Project duration (years) 10 (estimated)



Information for project LE011

Information on the promoter

Promoter’s contact information Terreau Biogaz s.e.c.
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
Contact information for the promoter’s representative Rino Dumont
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
   
Information on the project  
Project title Capture and destruction of biogas from the Robertsonville sanitary landfill site
Summary description of the project The promoter wishes to operate the biogas capture and destruction system on the former Robertsonville sanitary landfill site (SLS) owned by the Régie intermunicipale de la région de Thetford. The biogas will be collected by vertical capture wells and routed through a network of collecting pipes to an invisible flame flare for destruction.
Project site location 3626, boulevard Frontenac Est, Thetford-Mines (Québec) G6H 4G2
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2018-04-18
Average annual reductions estimated by the promoter (mt CO2 eq.) 7,837
Total reductions estimated by the promoter (mt CO2 eq.) 78,370
Project commencement date 2018-04-15 (estimated)
Project duration (years) 10 (estimated)
Issuance of offset credits
1st reporting period
Report period date 2018-09-15 to 2019-09-14
Number of offset credits issued 4,794
Issuance date 2020-05-13
Note concerning the issuance of offset credits (PDF, 115 KB)
Project report (French, PDF, 21.7 MB)
Verification report (French, PDF, 21.3 MB)
2nd reporting period
Report period date 2019-09-15 to 2020-09-14
Number of offset credits issued 5,802
Issuance date  2021-03-10
Note concerning the issuance of offset credits (PDF, 117 KB)
Project report (French, PDF, 19.3 MB)
Verification report (French, PDF, 19.8 MB)



Information for project LE012

Information on the promoter

Promoter’s contact information Terreau Biogaz s.e.c.
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
Contact information for the promoter’s representative Rino Dumont
  1327 avenue Maguire bureau 100, Québec (Québec) G1T 1Z2
  418 476-1686
  rino.dumont@groupeth.com
   
Information on the project  
Project title Capture and destruction of biogas from the Ragueneau engineered landfill site
Summary description of the project The promoter wishes to operate the biogas capture and destruction system at the engineered landfill site (lieu d’enfouissement technique – LET) of Ragueneau, which is owned by the Régie de gestion des matières résiduelles de Manicouagan, located in Ragueneau. The biogas will be collected by vertical capture wells and routed through a network of collecting pipes to an invisible flame flare for destruction. New biogas capture wells will be constructed as landfill operations progress on the LET.
Project site location 5101 chemin de la Scierie, Ragueneau (Québec) G0H 1S0
Applicable regulation Regulation respecting landfill methane reclamation and destruction projects
Date of submission of project notification (or date of registration) 2019-01-22
Average annual reductions estimated by the promoter (t CO2 eq.) 16,755
Total reductions estimated by the promoter (mt CO2 eq.) 167,550
Project commencement date 2018-11-10 (real)
Project duration (years) 1010 (estimated)
Issuance of offset creditsstrong>
1st reporting period
Report period date 2018-11-09 to 2019-11-08
Number of offset credits issued 8,057
Issuance date 2020-05-13
Note concerning the issuance of offset credits (PDF, 115 KB)
Project report (French, PDF, 11.2 MB)
Verification report (French, PDF, 11.7 MB)
2nd reporting period
Report period date 2019-11-09 to 2020-11-08
Number of offset credits issued 10,998
Issuance date 2021-03-10
Note concerning the issuance of offset credits (PDF, 117 KB)
Project report (French, PDF, 8.0 MB)
Verification report (French, PDF, 8.4 MB)



Information for project SACO001

Information on the promoter

Promoter’s contact information Recyclage Écosolutions Inc.
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 829-1469, ext. 2
  aross986@gmail.com  
Contact information for the promoter’s representative Arnold Ross
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  81819 679-1462, ext. 2
  aross986@gmail.com a>
   
Information on the project  
Project title ODS extraction and destruction
Summary description of the project GHG emission reductions under a project for the destruction of ODS contained in foam or GHG emission reductions under a project for the destruction of ODS used as refrigerants removed from refrigeration, freezer and air conditioning appliances. ODS are first extracted at the RES Laval Site (Quebec, Canada) with a unique automated process. Concentrated ODS are then destroyed in an ODS destruction facility using an incineration process (Clean Harbors, El Dorado, USA).
Project site location 3700, avenue Francis-Hughes, Laval (Québec) G9H 0B6
Applicable regulation Regulation respecting halocarbon destruction projects
Date of submission of project notification (or date of registration) 2015-01-13
Average annual reductions estimated by the promoter (mt CO2 eq.) 136,441
Total reductions estimated by the promoter (mt CO2 eq.) 409,323
Project commencement date 2009-07-10 (real)
Project duration (years) 3 (real)
Other information Project ended
Issuance of offset credits
1st reporting period
Report period date 2009-06-17 to 2011-10-13
Number of offset credits issued 161,510
Issuance date 2015-07-07
Note concerning the issuance of offset credits (PDF, 17 KB)
Project report (French, PDF, 37 MB)
Verification report (French, PDF, 1.7 MB)



Information for project SACO002

Information on the promoter

Promoter’s contact information Recyclage Écosolutions Inc.
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 829-1469, ext. 2
  aross986@gmail.com 
Contact information for the promoter’s representative Arnold Ross
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  81819 679-1462, ext. 2
  aross986@gmail.coma>
   
Information on the project  
Project title Extraction and destruction of ODS contained in insulating foam or used as refrigerants
Summary description of the project GHG emission reductions under a project for the destruction of ODS contained in foam or GHG emission reductions under a project for the destruction of ODS used as refrigerants removed from refrigeration, freezer and air conditioning appliances. ODS are first extracted in Canadian facilities with a unique automated process. Concentrated ODS are then destroyed in an ODS destruction facility using an incineration process (Clean Harbors in El Dorado, Arizona, USA) or by using the Plasma system at Recyclage Écosolutions in Laval (Québec), the future destruction facility at Recyclage HaloSecure in Bécancour (Québec) or the SENA Waste Services Inc site in Swan Hills, Alberta.
Project site location 3700, avenue Francis-Hughes, Laval (Québec) G9H 0B6
Applicable regulation Regulation respecting halocarbon destruction projects
Date of submission of project notification (or date of registration) 2015-11-25
Average annual reductions estimated by the promoter (mt CO2 eq.) 64,000
Total reductions estimated by the promoter (mt CO2 eq.) 320,000
Project commencement date 31-05-2013 (real)
Project duration (years) 5 (estimated)
Other information Project ended
Issuance of offset credits
1st reporting period
Report period date 2013-05-21 to 2015-10-28
Number of offset credits issued 306,298
Issuance date 2016-05-25
Note concerning the issuance of offset credits (PDF, 122 KB)
Project report (French, PDF, 69 MB)
Verification report (French, PDF, 1.4 MB)
2nd reporting period
Report period date 2015-10-30 to 2016-10-29
Number of offset credits issued 16,645
Issuance date 2017-05-10
Note concerning the issuance of offset credits (PDF, 18 KB)
Project report (French, PDF, 15.3 MB)
Verification report (French, PDF, 1.1 MB)



Information for project SACO003

Information on the promoter

Promoter’s contact information Groupe PureSphera Inc.
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 829-1469, ext. 2
  aross@puresphera.com 
Contact information for the promoter’s representative Arnold Ross
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 679-1462, ext. 2
  aross@puresphera.com
   
Information on the project  
Project title ODS extraction and destruction
Summary description of the project GHG emission reductions under a project for the destruction of ODS contained in foam or GHG emission reductions under a project for the destruction of ODS used as refrigerants removed from refrigeration, freezer and air conditioning appliances. ODS are first extracted in Canadian facilities with a unique automated process. Concentrated ODS are then destroyed using the expected destruction facility of PureSphera in Bécancour (Québec) or using SENA waste Services inc. at Swan Hills, in Alberta.
Project site location 100-4170 boul. Laprade, Bécancour (Québec) G9H 0B6
Applicable regulation Regulation respecting halocarbon destruction projects
Date of submission of project notification (or date of registration) 2018-04-09
Average annual reductions estimated by the promoter (mt CO2 eq.) 80,000
Total reductions estimated by the promoter (mt CO2 eq.) 400,000
Project commencement date 2018-02-13 (real)
Project duration (years) 5 (estimated)
Other information Project ended
Issuance of offset credits
1st reporting period
Report period date 2018-02-13 to 2018-06-30
Number of offset credits issued 50,165
Issuance date 2018-11-28
Note concerning the issuance of offset credits (PDF, 8 KB)
Project report (French, PDF, 2.6 MB)
Verification report (French, PDF, 457 KB)



Information for project SACO004

Information on the promoter

Promoter’s contact information Groupe PureSphera Inc.
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 829-1469, ext. 2
  aross@puresphera.com 
Contact information for the promoter’s representative Arnold Ross
  1000, rue du Haut-Bois Nord, 1er étage, Sherbrooke (Québec) J1N 3V4
  819 829-1469, ext. 2
  aross@puresphera.com
   
Information on the project  
Project title ODS extraction and destruction
Summary description of the project Greenhouse gas (GHG) emission reduction through the destruction of ODS contained in insulating foams or used as refrigerants removed from Canadian refrigeration, freezer and air conditioning appliances. The ODS are first extracted at Canadian installations via a unique automated process. The recovered and concentrated ODS are destroyed either at the future destruction centre of the Groupe PureSphera Inc. in Bécancour, Québec, or the SENA Waste Services Inc. site in Swan Hills, Alberta.
Project site location 100-4170 boul. Laprade, Bécancour (Québec) G9H 0B6
Applicable regulation Regulation respecting halocarbon destruction projects
Date of submission of project notification (or date of registration) 2020-02-26
Average annual reductions estimated by the promoter (t CO2 eq.) 80,000
Total reductions estimated by the promoter (mt CO2 eq.) 400,000
Project commencement date 2020-02-10 (estimated)
Project duration (years) 5 5 (estimated)
Other information Project ended
Issuance of offset credits
1st reporting period
Report period date 2020-02-11 to 2020-08-11
Number of offset credits issued 44,167
Issuance date 2021-02-24
Note concerning the issuance of offset credits (PDF, 8 KB)
Project report (French, PDF, 62MB)
Verification report (French, PDF, 928 KB)



Updated: July 22nd, 2021

Back to The Carbon Market

 

Evaluation of the page Learn more

As part of its 2019—2023 Strategic Plan, the Ministère wishes to improve access to information that is available on its website. Can we count on your co-operation by responding to a survey at the bottom of each page? This will enable us to evaluate how easy it was to find the information you were looking for.

How easy was it to find the information you were looking for today?
Easy Difficult